| | | | | | | |  | Competitive Bid Reports - C2 D
COMMISSION MEMORANDUM |
| | | |
| | | | | | | | TO: | Honorable Mayor and Members of the City Commission | | FROM: | Jimmy L. Morales, City Manager | | DATE: | March 7, 2018 | | |
| SUBJECT: | REQUEST FOR APPROVAL TO ISSUE REQUEST FOR PROPOSALS (RFP) NO. 2018-076-ND EXTERIOR REPAIR AND COATING OF PRESTRESSED CONCRETE WATER TANKS.
|
| | | |
| | | | | | | | RECOMMENDATION
| Authorize the issuance of the RFP. |
| | | |
| | | | | | | | ANALYSIS
| Rule 62-555.350, Operation and Maintenance of Public Water Systems, of the Florida Department of Environmental Protection (FDEP) and the American Water Works Association (AWWA) Standard D110 for Wire- and Strand-Wound Circular, Prestressed Concrete Water Tanks dictate that wire- or strand-wound prestressed water storage tanks be inspected for structural and coating integrity at least once every five years. The prestressed water storage tanks located at 75th Street Water Pump Station No. 23 and 451 Dade Boulevard, Miami Beach, Florida 33140 were inspected in May of 2017. The inspection did not reveal any apparent problems that would cause concern for the structural integrity of the tank. However, the inspection did result in recommendations that should be addressed in order to avoid the possibility of future problems.
Through this RFP the City seeks to receive proposals from firms experienced in the repair and maintenance of prestressed concrete potable water storage tanks.
• MINIMUM QUALIFICATIONS. Please Reference, Appendix C, Page 30, RFP 2018-076-ND for Exterior Repair and Coating of Prestressed Concrete Water Tanks (attached).
• SUBMITTAL REQUIREMENTS. Please Reference Section 0300, Page 17, RFP 2018-076-ND for Exterior Repair and Coating of Prestressed Concrete Water Tanks (attached).
• CRITERIA FOR EVALUATION. Please Reference Section 0400, Page 19, RFP 2018-076-ND for Exterior Repair and Coating of Prestressed Concrete Water Tanks (attached).
|
| | | |
| | | | | | | | CONCLUSION
| The City Manager recommends that the Mayor and Commission authorize the issuance of the RFP 018-076-ND for Exterior Repair and Coating of Prestressed Concrete Water Tanks.
|
| | | |
| | | | | | | | KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With Full Accountability |
| | | |
| | | | | | | | FINANCIAL INFORMATION
| Grant funding will not be utilized for this project. |
| | | |
| | | | | | | | Legislative Tracking Public Works/Procurement |
| | | |
|