IN RE: An application has been filed requesting a Certificate of Appropriateness for the construction of a new 5-story building to replace the existing surface parking lot and pedestrian bridge over the 44th Street right-of-way, including variances to reduce the front, street side, interior side and sum of the sides setbacks for the subterranean, pedestal and tower levels, to reduce the residential or commercial use required facing the streets when providing parking at the ground level and to reduce the required setback for columns from the drive aisle.
| | |