IN RE: An application has been filed requesting a Certificate of Appropriateness for the total demolition of an accessory structure, the restoration of an existing 2-story building, the construction of a new, detached 3-story ground level addition, one or more waivers and variances to reduce the required width, curb cut width and setback for a two way driveway, to reduce the required pedestal rear and side setbacks, and to reduce the required pedestal sum of the side yards.[Continued from the February 12, 2019 meeting]
| | |