IN RE: An application has been filed requesting Design Review Approval for the construction of a new 7-story mixed-use / office building on the “Main Parcel”, including one or more waivers, and a variance from the maximum allowed building height, and minimum height required for the ground floor clearance, to replace all existing structures on the “Main Parcel”, and the retention of the existing structures on the “North Parcel” and “South Parcel”. [Note: application approved on 10/11/2023, with the exception of the variance for ground floor clearance.]
| | |