In any event, the standards for maintenance, repair and replacement of the Garage shall be no less than the standards maintained in municipal parking garages that are operated and maintained by the City. Edens shall always take good care of, maintain, and shall make all repairs reasonably necessary to keep the Property in good and safe order condition. They shall promptly rectify any damage or interference caused by Developer (Edens) to any Property, improvements, equipment, structures, or vegetation inside or outside of the Development Site, which is owned or controlled by City. Edens shall at all times comply with all requirements with respect to the use, condition, operation, ownership, maintenance, and remediation of the Property.
Over recent years, the condition of the Property has deteriorated. In addition, the security program needs to be strengthened to incorporate traffic and access controls to all patrons during and after Property operating hours to deter and prevent vehicles driving to the top parking deck, after closing hours and performing unsafe and loud maneuvers.
On March 2, 2022, these deficiencies were discussed at the Public Safety Neighborhood and Quality of Life Committee (PSNQLC) meeting. At the request of Commissioner Meiner, an update on the status of the items was to be presented at the June PSNQLC meeting. Subsequently on March 14, 2022, the Administration along with several City Commissioners and the Edens property management team conducted a walkthrough of the Property to further identify and address deficiencies.
On June 15, 2022, Administration presented at the PSNQL meeting the following updates:
· Homeless Issue – the City’s Homeless Outreach team has been working with the Edens team to address the homeless issues in the area. This collaboration has reduced the number of homeless in the area as well as provided the homeless assistance needed.
· Sidewalk Repairs – the sidewalks along 5th Street were uneven, causing a tripping hazard. The sidewalks have been repaired.
· Paint – the first floor of the complex has been painted, along 6th Street. It has been painted grey and white to allow for a cleaner appearance since that street has the most traffic.
· Freebee Valet Stand – located on the 3rd floor of the garage, a partner with the City of Miami Beach to help the City provide on-demand transportation to the residents as well as low-income seniors in South Beach has been responsive and cleaned up the area they currently use.
· Bus Stop Signage – the signs surrounding the bus stop area on Alton Road have been replaced and the area has been painted.
· The Edens team has prepared a list of capital improvements, which have been reviewed in conjunction with the City’s Parking Department. Since last presented in June, the schedule for these projects have been updated (below) and remain on target to be completed in 2022:
o Roof/ Waterproof – Start August 2022 and to be completed by December 2022
o CCTV upgrade – $150k will be spent in 2022 – starting May 2022 and to be completed by end of September 2022
o Elevator Upgrade – $450k will be spent in 2022. Due to sourcing of materials, this project will start in October 2022 and to be completed by December 2022
o Stormwater redevelopment - There are two wells that will be redeveloped. Starting in April 2022 and be completed by the end of September 2022
At the June 15th PSNQL Meeting, Commissioner Meiner requested this item be brought back to Committee one more time during the September PSNQL meeting.
Staff has continued to conduct regular inspections of the Property and maintains an open line of communication with the Eden’s team to ensure identified deficiencies are addressed quickly (Exhibit A). Eden’s maintenance staff has implemented a consistent schedule and are often seen sweeping, painting and cleaning the exterior building and the garage decks.