| | | | | | | |  | Resolutions - C7 E
COMMISSION MEMORANDUM |
| | | |
| | | | | | | | | TO: | Honorable Mayor and Members of the City Commission | | | FROM: | Alina T. Hudak, City Manager | | | DATE: | September 14, 2022 | | | |
| | SUBJECT: | A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE FLOOD MITIGATION PLAN, A REQUIRED DOCUMENT FUNDED THROUGH A FLOOD MITIGATION ASSISTANCE GRANT (FMA) FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), AS PART OF THE CITY’S OVERALL RESILIENCE PROGRAM. |
| | | |
| | | | | | | | RECOMMENDATION
| | Approve and accept the flood mitigation plan to close out the FMA grant. |
| | | |
| | | | | | | | BACKGROUND/HISTORY
| | Under the former Emergency Manager, the City applied for, and was approved for a FEMA Flood Mitigation Assistance Program (FMA) grant to develop a Flood Mitigation Plan (FMP). Concurrent with the genesis of this plan, the Public Works Department was working with consultants to develop the citywide comprehensive plans including strategies to address sea level rise. The FMP, prepared by Jacobs Engineering at the direction of the Division of Emergency Managment, was completed in 2020. The plan was reviewed and accepted by the Florida Division of Emergency Management (FDEM) and provides an overview of City strategies to best address vulnerability to flood hazards. This plan is consistent with the Local Mitigation Strategy (LMS), National Flood Insurance Program (NFIP) and its completion benefits the Community Rating System (CRS). |
| | | |
| | | | | | | | ANALYSIS
| | The Flood Mitigation Plan was developed by Jacobs Engineering, the consultant responsible for other City pans, to address impacts of sea level rise, and therefore serves as an overview of strategies included in City planning to reduce the overall risk of structures within the City experiencing flood damage and reduce the severity of flood damage when it occurs. The process for completing the plan leveraged prior community engagement and input from various City departments, as well as available scientific data. The plan was completed in 2020 and reviewed by FDEM. In order to obtain grant reimbursement, the grant closeout requires formal approval by the City Commission. |
| | | |
| | | | | | | | FINANCIAL INFORMATION
| | Grant |
| | | |
| | | | | | | | | Amount(s)/Account(s): | 011-0325-000312-18-401-508-00-00-00
Project D3225702 Total 24,496.83 paid to Jacobs
5/8/20 $16,697.25
5/11/20 $7,799.58
Covered by the FMA Grant |
| | | |
| | | | | | | | CONCLUSION
| | Approve the FMP to satisfy the grant. |
| | | |
| | | | | | | | | Is this a "Residents Right to Know" item, pursuant to City Code Section 2-14? | | Does this item utilize G.O. Bond Funds? | | | No | | No | |
| | | |
| | | | | | | | Strategic Connection
| | Environment & Infrastructure - Reduce risk from storms, high tides, groundwater, and sea level rise. |
| | | |
| | | | | | | | Legislative Tracking Emergency Management |
| | | |
|