COMMISSION MEMORANDUM |
| | | |
| | | | | | | | | TO: | Honorable Mayor and Members of the City Commission | | | FROM: | Alina T. Hudak, City Manager | | | DATE: | July 28, 2021 | | | |
| | SUBJECT: | A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE
AMENDMENT NO. 6, TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF MIAMI BEACH AND RIBBECK ENGINEERING, INC,
("RIBBECK") FOR THE INDIAN CREEK DRIVE/STATE ROAD (SR) A1A, 26TH
STREET TO 41ST STREET FLOODING MITIGATION PROJECT ("PROJECT"),
IN THE NOT TO EXCEED AMOUNT OF $125,541.19, FOR A TOTAL PROJECT
BUDGET OF $3,770,818.48, TO PROVIDE ADDITIONAL ENGINEERING
SERVICES FOR THE SEAWALL COMPONENT OF THE PROJECT. |
| | | |
| | | | | | | | RECOMMENDATION
| | The Administration recommends approving the Resolution. |
| | | |
| | | | | | | | BACKGROUND/HISTORY
| At its June 8, 2016, meeting, the City Commission approved Resolution No. 2016-29456, authorizing the City Manager to negotiate a Professional Services Agreement with Ribbeck Engineering, Inc. (“Ribbeck”) in an amount not to exceed $407,851, for the preparation of a Design Criteria Package (DCP) and conceptual plans, for the City’s Indian Creek Drive/State Road (SR) A1A, 26th Street to 41st Street - Flooding Mitigation Project. Originally this project was considered a public emergency and to expedite the construction, the City selected a design build method of procurement.
At its April 26, 2017 meeting, the City Commission approved Resolution No. 2017-29839, authorizing the City Manager or his designee to negotiate Amendment No. 1 to the Professional Services Agreement with Ribbeck, in the amount of $949,489.11, to provide for the preparation of a set of interim construction plans from 25th to 26th Street, and the design of the drainage trunk line between 25th Street to 32ndo street, inclusive portion of the stormwater pump station. This amendment included the limited design and permitting coordination of the seawall within the project limits using the then Public Works seawall standard design.
At its October 18, 2017 meeting, the City Commission approved Resolution No. 2017-30070, authorizing the City Manager or his designee to negotiate and finalize Amendment No. 2 to the Professional Services Agreement with Ribbeck, in the amount of amount of $1,214,799.94, to provide for the preparation of the final set of complete signed and sealed construction plans from 25th to 26th Street, and 26th to 41st Street, including side streets along the entire project limits, with the construction plans to include roadway, traffic control plans, seawall, drainage, signing and pavement markings, lighting and signalization components, and related improvements. The final construction documents were prepared to be used for competitive bid as the City changed between design build method of procurement to design bid build to increase competition.
At its October 17, 2018 meeting, the City Commission approved Resolution No. 2018-30547, approving and authorizing the Mayor and City Clerk to execute Amendment No. 3 to the Professional Services Agreement between the City and Ribbeck, in the amount of $339,196.5, for additional engineering services for the project including subsurface utility engineering and preparation of harmonization plans.
At its September 11, 2019 meeting, the City Commission approved Resolution No. 2019-30943, approving and authorizing the Mayor and City Clerk to execute Amendment No. 4 to the Professional Services Agreement between the City and Ribbeck in the amount not-to-exceed $383,670, to include additional construction services and supplement the harmonization efforts required to completion.
At its June 24, 2020 meeting, the City Commission approved Resolution No. 2020-31292, authorizing the Mayor and City Clerk to execute Amendment No. 5 to the Professional Services Agreement between the City and Ribbeck, in the amount of $350,270.73, to provide additional engineering services for the project during construction including the relocation of the stormwater pump station generator to the City parking lot located at Indian Creek Drive and 27th Street and related public information coordination. |
| | | |
| | | | | | | | ANALYSIS
| The design and limited construction inspection services in this amendment supplements the design and permitting efforts included in the previous amendments. The additional design and permitting services include the new design to be compatible with the current Public Works seawall standards; perform inspection and certify the construction of the newly installed seawall; apply for and obtain building permits for the new seawall installation; perform the necessary construction inspection of the seawall and certify the installation of the new seawall.
The current permit status of the seawalls are as follows:
- All environmental permits have been approved. The City’s building permit is part of this amendment to be processed.
- DERM requires the Building Department and a mitigation bond payment to formally issue the final permit. Public Works paid the mitigation bond and submitted the DERM approved plans to the Building Department. Building provided comments for Public Works to address with the consultant, which requires an amendment to the contract agreement with Ribbeck Engineering, Inc.
Ribbeck Engineering, Inc. has submitted a negotiated cost proposal (ATTACHMENT) in the not to exceed amount of $125,541.19, for engineering services including (but not limited to) developing contract documents for approximately 4,343 linear feet (LF) of concrete pile and panel seawall, including the structural evaluation of 1,612 LF of existing seawall to remain. Provide structural calculations. Provide visual structural inspections for existing sections of recently built seawall. A letter with repair recommendations retrofit existing installations will be provided, if required for final inspection acceptance. This evaluation includes the review of construction documentation (i.e. pile driving records, concrete tests, bill of reinforcing bar installations to be provided by City of Miami Beach.
The Public Works Department has reviewed the cost proposal and has determined fair and reasonable. This Amendment No. 6 will bring Ribbeck’s contract in the total amount to $3,770,818.48.
FISCAL IMPACT
Capital-Contracts 433-0815-069357-29-418-564-00-00-00-29020 $125,541.19
Total $125,541.19 |
| | | |
| | | | | | | | SUPPORTING SURVEY DATA
| Results from the 2019 Resident Survey regarding Satisfaction with Perceptions of the City show that 46% of residents rated City efforts to reduce risk from rainfall & sea level rise as very satisfied/satisfied. In order to improve in this area, the Administration recommends approving amendment No. 6 to its contract agreement with Ribbeck Engineering, Inc.
|
| | | |
| | | | | | | | Applicable Area
| | South Beach |
| | | |
| | | | | | | | | Is this a "Residents Right to Know" item, pursuant to City Code Section 2-14? | | Does this item utilize G.O. Bond Funds? | | | Yes | | No | |
| | | |
| | | | | | | | Legislative Tracking Public Works |
| | | |
|